News for September 2012

DAMAGED #8 phase 2&3

DAMAGED #8 – (museum damage – nose prints on surface of shampoo painting)

back to phase 1



phase 2

1  – 4   start of  second layer fresh substance – shampoo

5 – 6  shampoo surface completed

7 covering the painting to dry – protecting the wet surface for dust

8   waiting for phase 3


phase 3

1  – 7  third layer shampoo added to surface

8  waiting for phase 4





Posted: September 29th, 2012
Categories: damaged
Tags: , , , , , ,
Comments: No Comments.